Wastewater Treatment Station Ave




RESUME

2008

Wastewater Treatment Station Ave for FBO (DHV company).
Give an approximate view of reality, lifting the ground, surroundings and all the planned buildings in the project execution.
Interpret elevations, sections and plans of technical drawings, lifting share lines of military terrain maps, 3D drawing in AutoCAD, 3D Studio import, final adjustments in the drawings and material assignment. Placing cameras and lights, rendering in 3D Studio. Installation and video editing in Première.

SOFTWARE USED

autocad
40
3dstudio
30
premiere
30



Wastewater Treatment Station Ave